Traffic Alert – 12/16 and 12/19
On Friday, 12/16/11 Lowell Connector Southbound will be reduced from two travel lanes to one lane to allow the installation and relocation of the temporary barrier as shown on the stage three traffic management plan. This work will be done during the day starting at 9:00AM to 4:00PM. On Monday, 12/19/11 Lowell Connector Northbound travel lanes will be reduced from two to one same as above for the same barrier relocation work. Work will performed between 7:00AM to 3:00PM.